Status of Notes: DRAFT
Date: 12/10/2010
Time: 8:30 - 9:00 PST
Attendees: Umesh, Sri, John, Beau, Greg

Actions


1
12/08/10
Build is failing. Library Conflict.
Closed
John Theisen
12/10/10
2
12/08/10
Baremetal Installation and Testing Session
Open
Sri and Umesh
12/10/10
3
12/08/10
Check with Beau about the porting of Java Interfaces Code
Open
Vassil

4
12/10/10
Beau to ping Arien and Vassil about XD* meet
Open
Beau

5
12/10/10
Past code-a-than links to the Reference Implementation page
Open
Beau

6
12/10/10
Validation test guidelines to the Bare metal document
Open
Beau and Sri

Decisions
#
Date
Decision




Notes

  • Umesh has another meeting and he handed the meeting control to John.
  • Beau and Greg joined the call which was very valuable as we discussed the cross team issues.

Agenda


1. Review of actions from previous meeting
  • Action item #1 from the last meeting about the Build fail is resolved by John.
  • Action item #2 is on schedule. Sri and Umesh had a scheduled session at 11:15 PST.
  • Action item #3: Beau did not hear back from Vassil and he is waiting for him to call him. It is suggested that Beau pings Arien and Vassil after the meeting.

2. DNS Server Testing Status - Umesh
  • Umesh gave an update on his testing with Vision Share and MedAllies. His tests were successful with both instances.

3. Setup Status - John
  • Build failing issue for the installer is fixed and he checked in the code.
  • He is working on the new improvements to the build and will have new scripts by next week. The new scripts will make it more easy for the end user to install.

4. Web UI - John
  • No changes from last week.

5. Bare metal - Sri
  • Umesh and Sri will be working on the Bare metal install today and will have more by end of the week.

6. XD* - Vassil, Arien and Tone.
  • Vassil could not attend the meeting and did not discuss any XD* stuff this week.

7. Overall testing - Team
  • Greg brought up a good point about the load testing. He built a tool and he started testing on his instance.
  • John Theisen has a tool he used before to test his installation. He mentioned that test went well and his instance was very stable.
  • We discussed further and talked about using a common tool to test both Java and .net instances.

10. New Discussions.
  • Team requested Beau to put a link on the reference implementation page to point to the previous code-a-than pages.
  • Discussed about the Cert update process and it is decided that multiple certs can exists. It will be an add and delete process than a cert update proces. End user can add new certs using the config tools.
  • Also discussed about the validation tests after the bare metal installation. Beau said it is a good idea and he is going to add the links to the validations tests to his Bare metal document. Csharp team will do the samething.

9. Wrap Up

The meeting was wrapped up around 9:00 AM PST.