CSharp Scrum Meeting Notes 20101208

From Direct Project
Jump to navigation Jump to search
Status of Notes: DRAFT
Date: 12-08-2010
Time: 8:30 AM - 9:00 AM PST
Attendees: Umesh, John, Vassil and Sri

Actions


#
Date
Action
Status
Owner
Due Date
1
12/08/10
Build is failing. Library Conflict.
Open
John Theisen

2
12/08/10
Baremetal Installation and Testing Session
Open
Sri and Umesh
12/10/10
3
12/08/10
Check with Beau about the porting of Java Interfaces Code
Open
Vassil


Decisions

#
Date
Decision
1
12/08/10
CSharp Release 1.0 New Date is set to 12/31/10.


Notes


Agenda

  1. Review of actions from previous meeting
  2. Discussion based on Issue Framing
    • Build is breaking. Vassil found out the issue and John is looking at it. Minor conflict of the libraries.
  3. Review of actions and decisions
  4. Status Updates
  • DNS: Umesh:
      • Fixed DNS Bugs. Checked in. While Interop Testing with VisionShare. Verified with them and it is worked. Next 2 or 3 days testing with Cerner.
      • Check in the Anchors. Friday will work. 60% DNS install things. DNS patching things.
  • Setup: John :


      • Splitting setup so that the code. Full install on both the boxes. Remove the pieces which are not wanted. We would not be putting things.
      • Built the 1.0.0.3 installer. Last week included the virtuals for the DNS responder service.
      • Fix the XD stuff so that we can build and Install everything.
  • Bare metal: Sri Koka
      • AzHISP is up and running. Needs to be tested with Umesh Instance
      • Umesh suggested that we do the scratch install and he will show the tricks. Sri will take that knowledge and bring it into the Bare metal documentation
      • Sri and Umesh will test the instances Thursday or Friday.
      • Discussed the Cert update procedures. Umesh clarified that the Cert will not be updated. It will be an Add/Delete.



  • Web UI: John:
      • Feature Complete.
      • UI currently does not support the Cert updates. Those have to be done manually.


  • XD*: Vassil:
      • .Net build is setup in single project like the Java.
      • Still need to get a meeting with the Java folks. Vassil will get that scheduled.
      • The whole Java code may not be ported, only interfaces will be ported. Vassil needs to talk to Bueue to understand it.


5. Wrap Up: Team

  • Happy Testing and See you Friday.