CSharp Scrum Meeting Notes 20101208
Jump to navigation
Jump to search
Status of Notes: DRAFT
Date: 12-08-2010
Time: 8:30 AM - 9:00 AM PST
Attendees: Umesh, John, Vassil and Sri
Date: 12-08-2010
Time: 8:30 AM - 9:00 AM PST
Attendees: Umesh, John, Vassil and Sri
Actions
# |
Date |
Action |
Status |
Owner |
Due Date |
1 |
12/08/10 |
Build is failing. Library Conflict. |
Open |
John Theisen |
|
2 |
12/08/10 |
Baremetal Installation and Testing Session |
Open |
Sri and Umesh |
12/10/10 |
3 |
12/08/10 |
Check with Beau about the porting of Java Interfaces Code |
Open |
Vassil |
Decisions
# |
Date |
Decision |
1 |
12/08/10 |
CSharp Release 1.0 New Date is set to 12/31/10. |
Notes
Agenda
- Review of actions from previous meeting
- Discussion based on Issue Framing
- Build is breaking. Vassil found out the issue and John is looking at it. Minor conflict of the libraries.
- Review of actions and decisions
- Status Updates
- DNS: Umesh:
- Fixed DNS Bugs. Checked in. While Interop Testing with VisionShare. Verified with them and it is worked. Next 2 or 3 days testing with Cerner.
- Check in the Anchors. Friday will work. 60% DNS install things. DNS patching things.
- Setup: John :
- Splitting setup so that the code. Full install on both the boxes. Remove the pieces which are not wanted. We would not be putting things.
- Built the 1.0.0.3 installer. Last week included the virtuals for the DNS responder service.
- Fix the XD stuff so that we can build and Install everything.
- Bare metal: Sri Koka
- AzHISP is up and running. Needs to be tested with Umesh Instance
- Umesh suggested that we do the scratch install and he will show the tricks. Sri will take that knowledge and bring it into the Bare metal documentation
- Sri and Umesh will test the instances Thursday or Friday.
- Discussed the Cert update procedures. Umesh clarified that the Cert will not be updated. It will be an Add/Delete.
- Web UI: John:
- Feature Complete.
- UI currently does not support the Cert updates. Those have to be done manually.
- XD*: Vassil:
- .Net build is setup in single project like the Java.
- Still need to get a meeting with the Java folks. Vassil will get that scheduled.
- The whole Java code may not be ported, only interfaces will be ported. Vassil needs to talk to Bueue to understand it.
5. Wrap Up: Team
- Happy Testing and See you Friday.