Concrete Implementation WG Tracker

From Direct Project
Jump to navigation Jump to search
Actions
#
Date
Action
Status
Owner
Due Date
1
4/20/2010
David Kibbe will reach out to get a representative from AASP
Open
David Kibbe
4/27/2010
2
4/20/2010
Arien will reach out to SSA
Open
Arien
4/27/2010
3
4/20/2010
Vassil will get a statement from the Robust HIE WG– what is critical for an implementation to do to ensure the care about with current NHIN or IHE based transaction
Open
Vassil
4/27/2010
4
4/20/2010
Homework assignment:
Open
Entire Group
4/27/2010
· WG to read the three concrete implementations
· Catch up on Addressing Specification
· Catch up on Content Packaging Specification
· Catch up on Abstract Model
5
4/27/2010
Brian and Sean will report to implementation group later in day to call for champions and call for broader participation
Closed
Brian and Sean
5/4/2010
6
4/27/2010
Brian and Sean will publish timeline to wiki
Closed
Brian and Sean
5/4/2010
7
4/27/2010
Brian will start a thread to continue conversation about “minimum threshold” criteria on Wiki, all WG members are expected to continue
Closed
Brian & WG
5/4/2010
8
5/4/2010
Sean will post a skeleton outline on the Wiki for the NHIN Direct Slides and ask people to contribute
Open
Sean
5/12/2010
9
5/4/2010
Group will track the notion of multiple addresses – take this to the User Story
Open
Group
5/12/2010
10
5/4/2010
Vassil will put some feedback on the challenges of SMIME on the Wiki
Open
Vassil
5/12/2010
11
5/4/2010
Brief the S&T WG on security and trust issues related to concrete implementation
Open
Arien
5/12/2010
12
5/4/2010
Dragon will get XMPP code into source code
Open
Dragon
5/12/2010
13
5/11/2010
Sean will build a wiki page next to current minimal threshold and WG should contribute
Open
Sean & WG
5/17/2010
14
5/11/2010
Brian will arrange that we can track each Concrete Implementation Group’s status reports on the Wiki
Open
Brian
5/17/2010
15
5/11/2010
Each Concrete Implementation Group will provide weekly status reports by Tuesday at noon
Open
Each Concrete Implementation Group
Ongoing
16
5/11/2010
WG will have a “demo day” on the 25th which will be a LiveMeeting
Open
WG
5/25/2010
17
5/11/2010
WG will update the specification documents along with the concrete implementations
Open
WG
Ongoing